Handling; Prior To The Initial Commissioning Of The M260Se - ACD SetM260SEHF Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3 Handling

3.1 Prior to the initial Commissioning of the M260SE

In order to ensure that the battery inserted into the device at the factory is fully charged, insert the device into
the supplied DS260 docking station (if included in the scope of delivery), also see Section 3.2. Using the
supplied power supply unit, connect the docking station to the mains (Power LED shows a green light), also
see Section 3.2.
The battery charging process has been completed when the 'CHARGE' LED is green.
You can now use the M260SE handheld terminal.
You can see the battery charging process in Figure 2.
ATTENTION
ATTENTION
ATTENTION
M260SE_Brief_Overview_FCC_PEPPERL+FUCHS_V1.03_en_es.docx
Read all instructions first before using the M260SE!
Do not drink any alcohol or take any drugs while using the M260SE
and follow the saftey instructions carefully!
Only original ACD power supply units and ACD-approved batteries
may be used for the operation of the M260SE and the DS260. The
utilization of non-approved components can lead to the
destruction of the device. Remove the battery from the device if it
is not used for an extended period of time.
The M260SE battery is a lithium polymer battery pack. Lithium
polymer battery packs can explode if exposed to fire. Do not
disassemble the battery pack and do not expose it to fire or heat
(greater than 140 °F).
Prior to each use, the mobile data acquisition terminal, the docking
station and the connection cables must be inspected for damages.
Damaged parts must be replaced. Please contact ACD in either
case.
5 / 28

Publicidad

Tabla de contenido
loading

Productos relacionados para ACD SetM260SEHF

Este manual también es adecuado para:

Setm260se

Tabla de contenido