USAGE INSTRUCTIONS
For the first use, fill the kettle with water up to the maximum water level, boil water
and then pour boiling water out. Then clean the kettle with cool water. Repeat this
operation for one or two times to completely eliminate dust caused in production or
storage.
1. Put the power base on an even place.
2. Open the lid and fill the kettle with water. Do not overfill! Use the water level lamp.
CAUTION: Too much water may cause overflowing of boiling water. That's dange-
rous!
3. Close the lid and fit the kettle on power base.
4. Insert the plug in 240V~ power source.
5. Switch the machine to position "1". The lamp lighting up shows that the water is
being boiled.
6. Ten seconds after boiling, the kettle will automatically shut itself off (with "O" down-
wards) and the lamp will go off, you can also press "O" to shut off power manually.
7. Lift the kettle from the base first for pouring water.
8. After use, the kettle may be left on the base; however power must be shut off for
safety.
BOIL-DRY PROTECTION
Should you accidentally let the kettle operate without water; the boil-dry protection will
automatically switch off the power. If this occurs, allow the kettle to cool before filling
with cold water to reboil.
CLEANING AND MAINTENANCE
• Before cleaning, shut off power first, then lift the kettle from base and cool it down,
for safety, do not pull out the plug with wet hand.
• Never disassemble the body or base by yourself.
• Do not soak the kettle or base in water. Do not clean the kettle with high-corrosive
or polishing detergent.
• Clean the body and base with wet cloth, clean the inside with water or some deter-
gent if required.
• For best performance, check the filter regularly; if there is any furring, flush it with
water or eliminate it with soft brush (metal cleaner is forbidden).
• Please refer to relevant operation instrucions for furring removal.
14
ENGLISH
CASTELLANO