LF PORTFOLIO LBSH05MT Manual Del Usuario página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning installation of product, make sure all parts are present. Compare parts with
package contents list. If any part is missing or damaged, do not attempt to install, operate or
assemble the product.
Estimated Assembly Time: 15 minutes
No Tools Required for Assembly
ASSEMBLY INSTRUCTIONS
FLOOR LAMP ASSEMBLY:
1.
Adjust power cord length by pulling power cord from
base (E) until taut.
Screw lowermost tube (D) into base (E). Screw
uppermost tube (D) into lowermost tube (D).
NOTE: Keep cord taut during installation, ensuring
it does not get tangled or pinched between the
tubes (D).
2.
Screw socket assembly (C) into top of uppermost
tube (D). Remove floor lamp socket ring (A) from
top of socket assembly (C). Then, attach glass
bowl (B) to socket assembly (C), securing with floor
lamp socket ring (A).
CAUTION: Do not overtighten floor lamp
socket ring (A) as glass may crack or break.
1
E
2
B
C
Lowes.com/portfolio
3
D
D
Power Cord
A
D
G
G

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0613206

Tabla de contenido