Stepped Reaction Arm:
Place the reaction arm (C)
squarely against the selected
anchor point so that ONLY the
reaction range area (
sides of the reaction arm touch the
anchor point.
If other parts of the reaction arm touch
the anchor point, the reaction arm may
slip or break causing SERIOUS
INJURY and DAMAGE.
Placement of the reaction arm for bolt
tightening:
1. Position the Torque Multiplier and
the impact socket on the bolt to be
tightened.
2. Place the reaction arm on the right
of the anchor point.
Placement of the reaction arm for bolt
loosening:
1. Position the Torque Multiplier and
the impact socket on the bolt.
2.
Place the reaction arm on the left
of the anchor point.
EN
) on both
20
Reaction range
area on both sides
C