Hardware Pack 1
AA
BB
CC
Z
Fig.1: Assemble Decoration Gutter (A) by Bolt (AA) and Washer (BB).
Fig.2: Assemble Top Beam Connector (B) to Decoration Gutter (A) by Bolt (CC) and Washer (BB).
Bolt M6x35
Washer M6
Bolt M6x20
Wrench M6
12 PCS
30 PCS
18 PCS
2 PCS