INSTALLATION INSTRUCTIONS
Hook-Up Guide
IMPORTANT NOTE
Be sure to turn off the particular
circuit branch that provides power
to the wires you are accessing from
the main breaker panel.
Outlet Box Installation
For existing construction environments, you
will need to cut a hole in your wall to first install
the two gang outlet box that will go behind your
Monster In-Wall PowerCenter. Monster strongly
recommends you enlist the help of a licensed
electrician, or someone experienced with home
electrical wiring and custom installation.
If you are installing the Monster In-Wall
PowerCenter into new home construction
environments, the Two-Gang Outlet Box should
already be in place and the line and ground wires
already threaded through, ready for connection.
In this scenario, please proceed to the Surge
Module Installation section of these instructions.