Descargar Imprimir esta página

GAF Master Flow FVRABL Guia De Inicio Rapido página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

MasterFlow® Automatic
Foundation Vent -
APPLICATION INSTRUCTIONS
 
 
1. Knock out the old vent with a hammer and 
remove all mortar if necessary to create an 8" x 
16"opening. 
 
 
 
 
 
 
 
2. Place side of vent into opening first. Push the 
other side into place, making sure the vent 
flanges are firmly against wall. 
 
 
 
 
 
 
3. Thread screws through until they touch side 
walls, then tighten as necessary to create a snug 
fit.  
 
 
 
 
 
 
4. Fits standard 8" x 16" opening. No special 
tools required. F.H.A. (Federal Housing 
Authority) requires 1 sq. ft. of net free 
ventilation area for each 150 sq. ft. of crawl 
space without vapor retarder.  
 
gaf.com
FVRABL
®
Master Flow
 Technical Services 
 
1‐800‐211‐9612

Publicidad

loading