Installation Diagram; Installation Procedure; Door Properties - ZKTeco ML200 Serie Guia De Instalacion

Ocultar thumbs Ver también para ML200 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Screw C / Screw E
(optional)
Indoor
Battery
Unit
(not included)
Screw D
Battery Cover
Important Notice
You can either use the provided Double Sided Tapes or Stud to stabilize the
Outdoor Unit. Stud requires drilling an extra hole.

Door Properties

1
A.
Measure the door thickness
Measure the door thickness and select the proper Spindle and Screw length. For details,
please refer to the table contents of Page 1.
B.
Check the door opening direction
The position of the handle is determined by the opening direction of the door. Below is
the graphical representation of door opening direction in reference to your location
outside the room.

Installation Diagram

Gasket
Mounting
Plate
Screw B

Installation Procedure

Door
Stud (optional)
Gasket
Optional
*
Spindle
Latch
2
Outdoor Unit
Double Sided Tape
(optional)
Screw A
Strike Plate
and Box
Key

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ml300 serie

Tabla de contenido