ESAB EPP-600 Manual De Instrucciones página 304

Ocultar thumbs Ver también para EPP-600:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 230
section 6
three leads
6.4.4 procedure for verifying calibration of digital meters.
Voltmeter
1.
Connect a digital meter known to be calibrated to the positive and negative output bus bars.
2.
Compare the power source voltmeter reading to the calibrated meter reading. Readings should match within
±0.75%.
Ammeter
1.
External to the power source, connect a precision shunt in series with the work lead(s). The best shunt is one with a
value of 100 (50mV / 500A or 100mV / 1000A) and a calibrated tolerance of 0.25%.
2.
Use a calibrated 4 ½ digit meter to measure the output of the shunt. The amperage indicated with the external shunt
and meter should match power source ammeter to within 0.75%.
clear insulation
two leads
304
troubleshootinG
It is important to have the barrels of the black
and clear insulated wires, from the three lead
cable, be pointing in opposite directions.
The third wire attaches to the bus bar on the left
with the shunt mounting hardware. Orientation
of this wire is not critical.

Publicidad

Tabla de contenido
loading

Tabla de contenido