Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

REPLACEMENT OR INSTALLATION
INSTRUCTIONS FOR SWITCH
Disconnect the power from the pump before attempting to replace the switch. Works with many
WARNING
brands and models of submersible sump pumps (TETHERED SWITCH: Max. rating 13A at 125V/60Hz .
VERTICAL SWITCH: Max. rating 10A at 125V/60Hz).
Before assembling: You must remove the direct-in switch and insert the shunt plug (included) to the pump to check if the pump
can work normally if your pump is assembled with a direct-in switch.
比例 1.000
Plug the pump plug into 115V GFCI outlet, If the pump works, the float switch needs to be replaced.
If the pump doesn't work, the motor has failed.
Replace steps of tethered switch
Replace steps of vertical switch
1/2in.-1in.
For warranty registration please go to www.K2pumps.com
For Professional Technical Support call 1-844-242-2475
1. Unscrew the oat cord nut.
Unplug the oat plug and
remove the old switch from the
pump.
1. Remove the old switch and
clamp from the pump.
Notice:
Keep the old clamp
and screw for next step.
2. Check the distance between
the oat and clamp and adjust
the distance to 4 in.(±0.5 in.).
Screw the clamp and switch
onto the pump.
1. Attach the bracket and switch
to the discharge pipe with
clamp, being sure to keep the
vertical switch vertical.
Notice: The bottom of the
float ball must be above
(1/2in.-1in.) the outlet of the
pump.
2. Tie the power cords of pump
and vertical switch to the
discharge pipe with cable tie
(included).
Take out the washer
Shunt Plug
and screw nut
(Included)
2. Cut off the oat cord and take out
3. Plug the power cord into the
4. Put the pump back into the pit.
5. Secure the pump.
6. Plug in the switch (with pump plug
7. Check the pump by lling the pit
Copyright © 2020, GP Enterprises Co., Ltd.
the washer and screw nut. Plug in
the shunt plug and add the washer
on the plug, then tighten the shunt
plug with the screw nut.
Piggyback switch.
connected) into the power outlet.
with water and observe the pump's
operation through one complete
cycle. Make sure the pump cannot
move in the pit and the oat switch
moves freely up and down.
3. Plug the pump power cord into the
piggy-back switch plug, then plug the
piggy-back switch cord into the GFCI
outlet. Check the pump & vertical
switch by lling the sump pit with
water and observe the operation of
pump & vertical switch through one
complete cycle. Make sure the pump
cannot move in the sump and the
vertical switch moves freely up and
Notice: Do not handle pump
down.
or vertical switch with wet hands
or when standing on wet or damp
surface, or in water.
K2Man-16 (Rev. 4/17/20)

Publicidad

loading

Resumen de contenidos para K2 Pumps 115V GFCI

  • Página 1 比例 1.000 Plug the pump plug into 115V GFCI outlet, If the pump works, the float switch needs to be replaced. If the pump doesn’t work, the motor has failed. Replace steps of tethered switch 1.
  • Página 2 INSTRUCCIONES PARA REEMPLAZAR O INSTALAR UN INTERRUPTOR Desconectar la energía de la bomba antes de intentar reemplazar el interruptor. Trabaje con varias marcas y modelos de bombas de sumidero sumergibles ADVERTENCIA (INTERRUPTOR ANCLADO: Potencia máxima de 13A en 125V/60Hz. INTERRUPTOR VERTICAL: Potencia máxima de 10A en 125V/60Hz). Antes de ensamblar: Debe retirar el interruptor en directo e insertar el tapón de derivación (incluido) a la bomba para revisar si la bomba puede funcionar de manera normal si su bomba está...