Hold the level against the side of the shelf bracket. Ensure
that the bracket is vertically level. Drill bottom pilot hole
and use lag screw to secure shelf. Just like with the top,
the lag screw should be snug, but not tight.
Note: In order to guarantee a level shelf, the top and
bottom lag screws must be tightened evenly.
Hardware Required:
4
Level, drill pilot,
insert lag
11