Install the battery connector cover under the EBM cable to provide strain relief.
3
Rotate the battery connector cover on its side and position under the EBM cable.
Connecting the EBM Cable
Plug the EBM cable into the UPS battery connector.
4
Secure the battery connector cover to the UPS rear panel using the screws removed in Step 2.
5
CAUTION:
Follow the instructions in the UPS Getting Started document or the Dell Line-Interactive Tower
UPS 500W, 1000W, and 1920/1500W User's Guide for instructions on installing the UPS.
6
Installation