Descargar Imprimir esta página

Spears BWV-3-0410 Manual De Instrucciones página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Components with Valve Extension Kit:
User Supplied Pipe
The components-only kits
require user-supplied Riser
and Handle extension pipes.
Pipes must be measured, cut,
assembled and installed by
the user.
Square-cut ends
must be maintained .
Acceptable RISER Pipe Types
Valve Size
for User-Supplied Pipe
4" Class 125 PVC PIPE
2"
4" Sch 40 PVC PIPE
5" Class 125 PVC PIPE
5" Sch 40 PVC PIPE
3"
6" D3034 (SDR35)
PVC SEWER PIPE
8" Class 125 PVC PIPE
4"
8" Sch 40 PVC PIPE
10" Class 125 PVC PIPE
6"
10" Sch 40 PVC PIPE
Note 1: Riser and Handle Pipe are not the same length. Sch 40 and/or Sch 80 pipe as
well as ABS may be used. Special cement must be used to join PVC to ABS.
Note 2: When 6" SDR35 pipe is used, adapter fits pipe inside diameter.
Note 3: DO NOT use Sch 80 for 3" Riser pipe.
With valve & access
STEP 1
plug in place, carefully measure
from plug top to where the extended
access plug top will be located
(Length D). Note: This dimension
is the basis for determination of the
actual riser pipe length.
From Table 3, use
STEP 2
dimension "D" to calculate Riser
and Handle Pipe lengths.
Cut Riser and Handle pipes to caculated length. Square-
STEP 3
cut ends must be maintained (see cutting and gluing guidelines).
CALCULATE RISER PIPE DIMENSIONS
Valve
Desired
Subtract
Height
Size
2"
D
1-1/4"
3"
D
1-1/8"
4"
D
1-3/4"
6"
D
1-3/4"
Pipe Materials, Table
Acceptable
HANDLE Pipe
3
Use any 3/4"
2
IPS plastic pipe
Desired PLUG Height
PLUG
Riser Pipe, Table 3
= RISER
= HANDLE
Subtract
cut length
Pipe cut Length
1-9/16"
1-11/16"
1-1/16"
1-1/16"
5
STEP 4
complete extension installation.
Refer to Installation Guidelines for
accepted joining procedures
2
STEP 1
sure to prevent solvent cement contact with the
internal body or fl ap assembly, as this could
prevent proper operation and sealing. Repeat
connection on opposite end.
Installation procedure same as above
1
utilizing a user-supplied valve, new or
STEP 1
to valve.
STEP 2
Riser Pipe.
STEP 3
Handle Extension Pipe.
(Length D)
If Pre-Made Extension is taller than required, Riser Pipe &
Handle Extension Pipe may be trimmed as follows:
STEP 1
extension temporarily fi tted to pipes, fi nd & pencil mark new (lower)
access plug top height onto riser pipe
or coupling.
STEP 2
the reference point to the plug top.
This dimension equals the amount
of material (Z) that must be trimmed
from Riser Pipe and the Handle
Extension Pipe.
STEP 3
tools, trim riser pipe. Remove the
same amount of material from the
Remove Access Plug and follow Steps 1-3, Section 1 to
Pre Made Extension KIts
and cure times.
Solvent Cement Valve to Pipe – Be
previously installed.
Solvent Cement Coupling end of Riser
Solvent Cement Threaded Adapter to
Solvent Cement Collar/Flapper Assembly to the Tee
TRIM PREMADE EXTENSION HEIGHT
With the pre-assembled valve, threaded adapter and plug
Measure gap between
Using recommended
6
Including Valve
User Supplied Valve
Height Reduction. Remove Z" from
both Riser
and Pipe.
Z"

Publicidad

loading