Barrette STANDARD Serie Instrucciones De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Panel/Post Installation:
1.
As the post is setting up, install the first fence
panel. Insert the horizontal rails from the panel into
the punched holes from the previously installed
post. Place the rails as far into the post as they will
go (Fig. 1).
2.
Place the next required post into the dug hole, and
slide the post onto the rails of the panel as far as
possible.
Plumb and level the post and add concrete
according to manufacturer's instructions.
3.
After setting first fence section, proceed
systematically with post, panel, post, etc. (Fig 3).
4.
After concrete has set, fasten the fence section to
the posts using #8 x 1" self-tapping screws (Fig. 4).
IMPORTANT:
Be careful not to over-tighten screws.
Fig. 1
Post
Rail
Rail
Top view of post
Fig. 2
Fig. 3
Fig. 4
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Heavy-duty serie

Tabla de contenido