Ultimaker S5 Material Station Guia De Inicio Rapido página 4

Ocultar thumbs Ver también para S5 Material Station:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 26
Install the Material Station
The Ultimaker S5 should be lifted by at least two people during installation.
Power off the Ultimaker S5 and remove the power cable, spool holder, and materials
during installation.
1.
Carefully place the
Ultimaker S5 on top of
the Material Station
4.
Secure the Bowden
tubes with clamp clips
2.
Insert a tube coupling
collet in the bottom
of each feeder of
the Ultimaker S5
5.
Place the spool holder
cap into the hole for
the spool holder of
the Ultimaker S5
3.
Insert the left Bowden
tube into the left
feeder, and the right
Bowden tube into
the right feeder
6.
Connect the Material
Station cable to the
UMB IN port at the back
of the Material Station

Publicidad

Tabla de contenido
loading

Productos relacionados para Ultimaker S5 Material Station

Este manual también es adecuado para:

S5

Tabla de contenido