Descargar Imprimir esta página

ASL DOG PALACE PREMIUM Guia De Inicio Rapido página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

DOG HOUSE ASSEMBLY INSTRUCTIONS
STEP 1
Place floor panel on a flat
surface with round support
rings facing down. Insert rear
end pend into end opposite of
drain hole
STEP 5
Insert front end panel
assembly with door into
assembly into floor as illus-
trated (repeat Step 4 assebly
instructions).
HEATER INSTALLATION INSTRUCTIONS
(Only used to Install heater sold separately)
STEP 1
Remove inside & outside red cap plugs
and insulation
STEP 2
Insert side panels into the
floor and rear end panel, front
corner first as illustrated.
STEP 6
Screw 2 Coated Deck
Screws into the 1/8" dia.
predrilled holes at each end
of the floor with a phillips
screwdriver. (Snug Only do
not over tighten)
STEP 2
Place heater in back half of house & run
electrical cord thru hole in panel resting
cord in bottom part of hole (Heater sold
separately)
STEP 3
Place roof on side panels and
slide into rear end panel as
illustrated.
Summer Cooling
STEP 1
Remove white thumb screw
invert window pane &
move up to storage position
& secure with thumb screw
STEP 3
Replace insulation in port hole & install
red plugs by rotating 90 degrees to close
hole from both sides
STEP 4
Insert 2 Cap Screws through 2
Screw Hinged Covers. Screw
the assembly through one of the
holes near the top of the end
panel and into the roof with a
Phillips screwdriver (snug only)
then close Hinged Screw Cover.
STEP 2
Remove white thumb screw
invert window pane & move
down to storage position &
secure with thumb screw.

Publicidad

loading