Mounting Examples; Pin Assignment - D+H ZA 35-BSY+ Manual Original

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Mounting examples

Uncritical load distribution
Domelight
* Guiding device required by customer in case of complete lift-off of pyramid/domelight,
because of possible lateral load due to wind pressure!

Pin Assignment

Standard
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
Connection: Page 18
Shifting of Motor
1. Move out toothed rack about 10 ... 20 mm.
Disconnect drive from electric Voltage!
2. Take off drive unit and shift
3. Attention! Moving direction of drive is changed.
Drive cable on the shutdown pcb, switch
red (+) with black (-)
10 ... 20 mm
99.824.31 1.2/03/12
Triangular pyramid *
Option -BRV
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
GY (-BRV)
PK (n.c.)
Critical load distribution
Pyramid *
Option -SGI/-SKS/-SA/-SZ
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
GY (-SGI/SKS/SA/SZ)
PK (+SGI/SKS/SA/SZ)
Shifting of drive cable
Disconnect drive from electric voltage!
English
Weighty wing
Option -SA-SZ
WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)
GY (-SZ)
GN (-SZ)
PK (-SA)
YE (-SA)
WH (n.c.)
BN (n.c.)
OG (n.c.)
7/20
ZA-BSY+

Publicidad

Tabla de contenido
loading

Tabla de contenido