1
Note: Adjustable extension column should only
be connected to UL Listed Peerless ceiling plates
with 1 1/2"-11.5 NPT threading. See instruc-
tions provided with ceiling plate for additional
assistance.
Thread adjuster tube (B) into bottom of threaded
fitting on ceiling plate (sold separately) as shown
in figure 1.1. Tighten adjuster tube so thread is
securely engaged.
Align one small hole in the threaded fitting of
ceiling plate with slot of adjuster tube (B). Insert
and tighten one M5 x 10 mm screw (not included)
through the hole of threaded fitting and slot of
adjuster tube (B) as shown in figure 1.2.
WARNING
• Adjuster tube (B) must be fully threaded (six
or seven full turns) onto threaded fitting in
ceiling plate and then locked with
M5 x 10 mm screw.
2
Slide extension pipe (A) into adjuster tube (B)
to the desired height. Rotate extension pipe (A)
and slide down into desired hook slot. Secure
with two screws (C) as shown in figure 2.1.
Note: Only UL Listed Peerless components with
1 1/2"-11.5 NPT threading should be connected
to the adjustable extension column.
To connect additional component to adjustable
extension column see instructions provided with
your component.
Peerless Industries, Inc.
3215 W. North Ave.
Melrose Park, IL 60160
www.peerlessmounts.com
ceiling plate (sold
separately)
fig 1.1
M5 x 10mm screw
(not included)
C
A
3 of 9
ISSUED: 10-10-09 SHEET NO: 154-9012-2 03-26-10
© 2009, Peerless Industries, Inc. All rights reserved.
All other brand and product names are trademarks or registered
1 1/2"-11.5 NPT
threading
B
fig 1.2
B
HOOK
SLOT
fig 2.1
trademarks of their respective owners.