EN
INSTALLATION - CONNECTION
Connect each component to the symbols added next to each relay (cables not included).
Please follow the connection order in accordance with the polarities.
In case of non-compliance, your solar charge controller as well as your battery may get damaged.
Connect your battery to the solar charge controller (+ and -)
Battery indicator turns on.
Select your battery's technology:
-
Press and hold the switch for 5 seconds, the active light flickers
-
Select your battery's technology by pressing the button
Liquid:
Gel :
AGM:
-
To confirm your selection, wait for 5 secondes. The light stops
flickering. Unisolar memorises your last setup.
Connect your photovoltaic panel to the solar charge controller (+ and -)
Connect your consumer to the solar charge controller (+ and -)
In case of disconnection, follow the opposite order.
NB : Grounding of the solar charge controller is not necessary. If you do want ground your installation, always
do it on the positive cables.
22/46
Open lead/acid liquid battery
Gel battery
Lead battery (maintenance-free), AGM...
www.uniteck.fr