Descargar Imprimir esta página

Putting Into Operation; Maintenance, Service And Repairs - Leister DIODE S Instrucciones De Funcionamiento

Ocultar thumbs Ver también para DIODE S:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15

Putting into Operation

Check the mains connection and the plug for mechanical defects!
Observe mains voltage:
6
The unit may not be operated without a sufficient air supply!
A
B
A
B
Operating Instructions
Digital Indications 9/Error Messages
B
Temperature indication:
General measures in case of error messages and malfunctions:
Heating-element protection:

Maintenance, Service and Repairs

– Check mains connection and plug for interruption and mechanical damage.
– Before any work on the unit: Pull the mains plug.
Warranty
English - 10 -
9
8
Error message:
Subject to change without notice
8
8

Publicidad

loading

Este manual también es adecuado para:

Diode pid129.099