Installation Of The Outdoor Unit - Acson IM-VCUA-0304- Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 29
Preliminary Site Survey
A place protected from rain, direct sunlight and well-ventilated wherever practicable.
A place capable of bearing the weight of the outdoor unit and isolating noise and vibration.
A place where there are no obstruction of air flow into or out the unit.
A place where smooth drainage of rain water and water formed by defrosting is acceptable.
A place where air outlet port is not exposed to strong wind.
A place where leaves, particles, water, snow or ice from roof or trees cannot fall directly on unit.
Do not put any object which may become obstacle for the air flow into or out the outdoor unit.
The location must not be susceptible to high concentration dust, oil, salt or sulfide gas.
The location must be away from the windows.
Outdoor Unit Installation
Shift the outdoor unit to final location before removing the carton and wooden base.
Install the outdoor unit firmly and horizontally. Maintain a space clearance from the obstruction as shown in below for
servicing and air ventilation. Allow 610mm clearance between units for proper air flow.
AIR IN
All models
Min distance, mm (in)
Wherever possible, additional structure and tie-down bolts might be used through mounting bracket provided in unit base
pan. Refer to unit-mounting pattern in unit outline and dimension to determine mounting location.

INSTALLATION OF THE OUTDOOR UNIT

AIR IN
OBSTACLE
AIR IN
AIR IN
A
305 (12)
305 (12)
1-3
AIR DISCHARGE
A
AIR IN
B
C
1219 (48)
B
OBSTACLE
AIR IN
D
762 (30)

Publicidad

Tabla de contenido
loading

Tabla de contenido