Filling With Oil - Cleco 250PTHFC226 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

250PTHFC226

6.6 Filling with Oil

1. Prefill the pulse unit with ESSO UNIVIS J26 using the injection
syringe <B>.
2. Connect the pulse unit to the quick-action coupling using the
adapter <A2>.
3. Close the shut-off cock.
4. Connect supply pressure of approx. 5 bar.
5. Slowly open shut-off cock, until the pressure gauge shows a
vacuum pressure of approx. 1 mbar (-1 bar).
6. Wait for approx. 2 minutes, until the number of vacuum bubbles
has decreased substantially.
7. Carefully close the shut-off cock. The pressure gauge again
shows atmospheric pressure, missing oil is forced into the pulse
unit.
8. Repeat steps 5 to 7 if necessary, until no more bubbles form.
-
Decouple the pulse unit, unscrew the adapter and top up with a
few drops of oil from the injection syringe <B>.
-
Fasten plug screw <88> (5+1 Nm).
Caution!
Caution!
The bearing ring <56> must not turn with the plug screw!
-
Pull needle roller <63> and fill the shut-off chamber behind it using
the injection syringe <B>, be sure there are no bubbles.
-
Reinstall needle roller <63>.
-
Tighten bearing ring <56> to the required torque (8. Assembly
Oil filling unit <A>
Muffler
Ultra-Vac
Oil: ESSO-UNIVIS J26
Order No. 925715
Container volume approx. 150 ml
Temperature 20°±5°C
Shut-off cock
Air supply 4.5 to 5.5 bar
10
Notes, fig. 16).
-
Install ball bearing <90> in housing <92>. Insert O-ring <91>.
-
Lock pulse unit to motor module.
-
Install equalizing washer <89> to hydraulic cylinder <86>.
-
Screw housing <92> onto pistol grip housing <1> and tighten it
using a strap wrench.
Remarks:
Small bubbles appearing at high vacuum pressure in the
wetting layer between the oil and the material are not
indicating leakage of the pulse unit. The filling result will
not be affected thereby.
6.7 Topping up Oil
-
Set valve screw <81> to minimum adjustment.
-
Remove plug screw <88>.
-
Unscrew bearring ring <56> by 360° +90° using assembly device
<C>.
-
Fill with oil as outlined in section 6.6.
Output shaft <73>
Pulse unit <55>
P1789E 06/04
Vacuum pressure gauge
Filling unit <A1>
Quick-action coupling
Connector <A2>
(comes with oil filling unit <A>)
Plug screw <88>
Unscrew bearing ring <56>
by 360° +90°
Needle roller <63>

Publicidad

Tabla de contenido
loading

Tabla de contenido