Installing The Electronic T-Junction; Important - Franke AQUA107 Instrucciones De Montaje Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

10.3 Align the water volume regulator in such a way that the screw plug (c) and the
operating element (d) are freely accessible. If necessary, loosen the flush connector
for this purpose.
10.4 Mount the tube (f) to the flush connector.
10.5 Open the water volume regulator with a hollow hexagon wrench.
g: closed
h: open
10.6 Flush the pipes in compliance with DIN 1988.
10.7 Check the connections for leaks.
10.8 Close the flow volume regulator.
10.9 Lay the system line (i) through the conduit and loop it from fitting to fitting.
Let the system line hang out of the in-wall installation box approx. 50 cm.
10.10 Install the electronic T-junction (k) (see
10.11 Remove the tube.
10.12 Mount the shell protector.

11. Installing the Electronic T-junction

Important!

The components of the electronic T-junction must be installed only when they are in
a dead condition.
Recommended system lines see
When using other cables for the system line, note the different colour coding. The
outer diameter must not exceed 7.5 mm.
11.1 Strip the shielding (a) off from the system lines (approx. 40 mm).
11.2 Fit the union nut (c) on to the system line (b) up to the stop.
The cable cores are marked with numbers 1 through 4.
A: Union nut
B: FAR-Order-No. 2000104272
FAR-Order-No. 2000104274
FAR-Order-No. 2000100801
FAR-Order-No. 2000100852
A
1
brown
2
white
3
blue
4
black
Chapter
Chapter
B
red
white
blue
black
11.).
19., Accessories.
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aqua105

Tabla de contenido