12
Insert a baluster into the first and last holes
in the rail.
14
Pre-drill the holes with a 1/8 in. bit, angling
slightly upward and inward to allow for
clearance from the rail once repositioned
for securing. Bracket shown for visual
reference only.
17
13a
Carefully position top rail over baluster.
Lower until balusters are fully inserted.
NOTE: It may be necessary to cut balusters
to achieve the desired height
15
Fully insert all balusters. NOTE: using
extended drill bits is recommended to
prevent damage to the rail, and allow a
more perpendicular driving angle.
verandadeck.com
13b
With the top rail fully seated, and using the
top bracket as a guide, mark the location of
the holes. Remove the top rail & balusters
before pre-drilling.
16
Complete the installation by gluing the post
cap in place with a quality
exterior adhesive.