Installation Instructions; Operation; Fill Water Tank; Preheating - eunasa Lucca CEM-BLK Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

04. INSTALLATION INSTRUCTIONS

01. Open the packaging to see whether there is any breakage or accessory parts shortage.
02. Place the machine in a dry secure place, which shall be adjacent to the current jack as well.
03. Take off the water tank, clean the tank, fill it with water, then put it back on the machine (only
cool purified water can be used, not hot water, tap water or other liquid).

05. OPERATION

5.1 Fill water tank

01. Unfold the water tank cover (fig. 1)
02. Take the water tank from the machine, fill in water (only cool purified water can be used, not
hot water, tap water or other liquid) (fig. 2), please do not overfill (max. 850 ml).
03. Replace the tank to the machine and cover the tank by the lid (fig. 3).

5.2 Preheating

After filling the water, connect to power supply and the turn on the power switch (on/off), the
machine starts the self-check procedure: power button and coffee button flash blue in 0.5s
according to the sequence, then the power button will be lighted in red, self-check procedure
completed.
Press the power button for preheating, button flashes blue and the coffee button doesn't shine.
About 45 seconds, both two buttons light in blue which means the machine is stand-by for making
coffee.
fig. 1
fig. 2
14
fig. 3

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para eunasa Lucca CEM-BLK

Este manual también es adecuado para:

Lucca cem-wht

Tabla de contenido