Ultimaker S5 Pro Bundle connections
1.
Connect the Air Manager cable to the
UMB OUT port on the Material Station
2.
Connect the Material Station cable to the
UMB IN port on the Material Station and
the other end to the UMB OUT port on
the Ultimaker S5
3.
Connect the power extension cable to the
Ultimaker S5 and the Material Station
4.
Connect the power cable to the Material
Station and the other end to a power outlet
A power outlet with an earth connection
must be used. Be sure that the building
1
installation has dedicated means for
over-current and short-circuiting.
The Material Station will automatically
2
power on when power is supplied. This
way the humidity can be continuously
controlled while the door is closed.
3
The Ultimaker S5 Pro Bundle must
be positioned out of direct sunlight
when in use. Ensure there is at least
4
10 cm of space behind the Ultimaker S5
Pro Bundle for airflow.