HyLoft TIRE LOFT Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MOUNTING THE UPRIGHT SUPPORTS
TO THE WALL STUDS
1A
Using a stud finder, locate 2 wall studs that are 32" to 48" center to center apart. Using a pencil,
mark the top mounting hole centers. Make sure holes are level and the same distance from the
floor. Pre-drill the 2 marked holes using a 3/16" (5 mm) drill bit.
IMPORTANT: Unit MUST be installed into wall studs. Do not use wall anchors for mounting directly to
sheet rock.
1B
Fasten vertical tubes of Left & Right Sides(A & B) to top pre-drilled holes
using a 7/16"(11 mm) nut driver or socket wrench, making sure holes are positioned as shown.
Do not fully tighten top screws at this time.
Make sure that Vertical Tubes of Left & Right Sides(A & B) are vertically level (plumb), & drill through
remaining 2 holes in each. Fasten with remaining Lag Screws(C) and fully tighten.
Approximate Assembly Time: 30 minutes or less
32"
to
48"
centers
Page 3 of 12
with 1 Lag Screw(C) in each

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hyi-01031

Tabla de contenido