Descargar Imprimir esta página

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 37
INSTALLATION
Install Fluid Level Gauge
Check Fluid Level
For shipping purposes, a plug is installed in the fill port on the top of the reservoir. See
illustration below.
1. Remove shipping plug.
2. Install the fluid level gauge that was shipped with the pump.
) CAUTION
The fluid level gauge acts as the vent for the reservoir and must be
installed whenever you run the pump. Never run the pump with the
shipping plug installed. This will cause damage to the pumping
mechanism.
Check the fluid level prior to start-up. The fluid level should be above the "2" band on
the gauge as pictured below. Add hydraulic fluid, if necessary. To add fluid, remove the
fluid level gauge and pour fluid through the opening in the top of the reservoir.
IMPORTANT: Add fluid only when all system components are in the fully retracted
position. If fluid is added when plungers are advanced, there will be more fluid in the
system than the reservoir can hold.
1. Empty
2. Add fluid
3. In Use
4. Full
2
1
2
1
4
3
4
... continued ...

Publicidad

loading