Westinghouse Contractor's Choice 78018 Manual Del Usuario página 10

Tabla de contenido

Publicidad

UL_Contractors52
5/18/04
10
Slide downrod ball (1) off of downrod and remove pin (2).
Deslice la esfera de la varilla vertical (1) hasta separarla de la
varilla vertical y quite el pasador (2).
10:02 AM
Page 10
EXTENDED DOWNROD OPTION
OPCIÓN CON VARILLA VERTICAL MÁS LARGA
11
2
Re-install pin into extended downrod, and slide downrod ball up to the top of the downrod. Re-install
set screw to secure ball to downrod. Note: Some extended downrods have a pre-drilled set-screw hole.
1
If a pre-drilled hole is present in the extended downrod, tighten the set screw into the pre-drilled hole
in the extended downrod. If no pre-drilled hole exists in the extended downrod, tighten the set screw
against the downrod to secure the downrod ball.
Vuelva a instalar el pasador en la varilla vertical más larga y deslice la esfera de la varilla hasta el
extremo superior de la misma. Vuelva a insertar el tornillo de fijación para asegurar la esfera a la
varilla vertical. Nota: Algunas varillas verticales más largas tienen un agujero previamente perforado
para el tornillo. Si la varilla vertical más larga tiene un agujero previamente perforado, ajuste el
tornillo en el agujero previamente perforado de la varilla vertical más larga. Si la varilla vertical
más larga no tiene un agujero previamente perforado, ajuste el tornillo sobre la varilla vertical para
asegurar la esfera de la misma.
10
UL-ES-5CC52-WH04(rev 1)

Publicidad

Tabla de contenido
loading

Tabla de contenido