Packing Contents; Routine Maintenance - Mantis Vision Engineering Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 16

Packing Contents

Universal mount
G-clamp
Counter balanced boom stand
Viewing head
Power adapter
Objective lens
Assembly
1
Secure the universal mount to the work
surface using the G-clamp provided or by
using appropriate screws located in the
holes of the Mount.
2
Place the universal arm on top of the
universal mount and lower it on to the
spigot until it is fully mounted.
3
Loosen the upper retaining bolt
universal arm. Remove the lower retaining
bolt
. Carefully place the locating hook of
the Mantis viewing head
retaining bolt of the universal arm.
Replace the lower retaining bolt
bolt passes through the lower locating mount of the
Mantis viewing head.
Tighten the upper and lower retaining bolts then re-seat the universal arm
rubber gaiter
4
Remove the red transit plug from the underneath of the viewing head.
5
Fit and lock the chosen objective lens into the objective seat.
6
Ensuring the power adapter is suitable for your supply voltage, connect the power adapter plug to a
suitable power outlet and its output connector to the base of the universal arm.
7
Connect the output lead at the top of the universal arm to the rear of the viewing head. Do not attempt to connect
the power adapter directly to the Viewing Head

Routine Maintenance

Desiccant Replacement
The desiccant removes excess moisture from the optical
head.
Disconnect the power supply from the bottom of
the head.
Remove the screw securing the desiccant cover
and lift the cover off.
Replace the desiccant.
LED Arrays
Remove the desiccant cover
Remove the two crosshead screws that secure the
LED array
filters
.
4
Mantis Compact with Universal Stand - User Guide
in the
over the upper
, ensuring that the
.
.
and remove the array complete with
www.visioneng.com/support

Publicidad

Tabla de contenido
loading

Tabla de contenido