Descargar Imprimir esta página

Putting Into Operation - Seliger QUELLSTAR 2000 LED Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

PUTTING INTO OPERATION

PUTTING INTO OPERATION IN SOURCE STONES
The following illustration gives a total view of the water feature:
32
2
Please observe the following indications for putting into operation of the QUELLSTAR 2000 LED:
• The water supply hose must have a diameter of 2".
• The drilling hole of the source stone must have a diameter of 72 mm.
• We recommend to countersink the Quellstar 2000 LED min. 5 mm and max. 15 mm into the source stone.
• We recommend to use
• a pump with an adjustable capacity so you can regulate the fl ow of water and
®
• the fountain special regiles
to prevent formation of algae and to prolong the life span of the components.
ENGLISH
11

Publicidad

loading

Este manual también es adecuado para:

40240