3
Attach the F Adjustment Bracket and the G
Retaining Bracket to the H Top Platform, using
four I Small Screws. Be sure that the slot of the
Adjustment Bracket is facing the two small holes
along the front edge of the Top Platform.
I
F
H
5
Align the hole in the Adjustment Bracket with the
top hole in the Upper Post; then insert the K Pivot
Bolt through the holes. Fasten with the L Nut, but
do not overtighten (the Top Platform must be able
to tilt freely).
Place the M Star Washer onto the stem of the N
Knob with Short Stem, and screw the Knob through
the slot in the Adjustment Bracket and into the hole
in the Upper Post.
L
8921-37: 2 of 2; 06/02
G
SLOT
SMALL HOLES
K
N
M
Safco Products Company, New Hope, MN 55428
4
Attach the J Paper Stop/Pencil
Ledge to the Top Platform, using the
two remaining Small Screws.
6
Level the unit using the levelers on the
Base.
Adjust the height by removing the two
Knobs, aligning the Posts to the
desired height, and reinserting the
Knobs.
Loosen the uppermost Knob, adjust
the Top Platform angle, and retighten.
J