Descargar Imprimir esta página

Pfister 15 Serie Manual De Instrucciones página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

5
5F
5A
HOT
5F
5 VALVE INSTALLATION
Valve Body inlets (5A) and outlets (5B) are designed to accomodate
NPT pipe. Connect pipe from Supply Valve Shower Oulet (5C) to Diverter
Valve Body Inlet (5A). Plug Supply Valve Tub Oulet (5D) and the other Diverter
Valve Body Inlet (5E) with Pipe Plugs (5F) (For Tub & Shower connections, do
not plug Supply Valve Outlets ).
WARNING: When attaching threaded fittings, use thread sealant or PTFE
Plumber's tape according to manufacturer's instructions.
CAUTION: When using iron pipes, it is not recomended to reduce outlet
pipe diameter.
6
SECONDARY
OUTLET
6A
6C
6
OUTLET INSTALLATION
Connect Primary (6A) and Secondary (6B) Outlet pipes to Diverter Valve
Body Outlets (6C).
ENGLISH
5E
5B
5C
5D
COLD
1
/
-14
2
6B
PRIMARY
OUTLET
7
SECONDARY
OUTLET
7B
PRIMARY
OUTLET
7 FLUSHING
Remove Plastic Cover (7A). Turn on Hot and Cold water supply lines. Rotate
stem (7B) counterclockwise allowing water to flow to primary outlet (7C).
Rotate stem (7B) clockwise allowing water to flow to secondary outlet (7D)
until all foreign matter has cleared the line. Repeat this step in the warm and
full hot positions.
Replace Plastic Cover (7A) into Diverter Valve Body (7E). Proceed to finish wall.
CAUTION: Maintenance
DISASSEMBLY
1.
Replacement parts may be available at the store where you purchased
your faucet.
2.
When replacement parts are not available, please write or call Price
Pfister Consumer Service.
3.
Always turn off water and relieve pressure before working on your
faucet.
1–800–PFAUCET (1–800–732–8238)
For Toll-Free Pfaucet information call
1–800–PFAUCET (1–800–732–8238)
or visit www.pfisterfaucets.com
• Installation Support
• Care and Warranty Information
3
7D
7E
7C
7A

Publicidad

loading