ASSEMBLY INSTRUCTIONS
13. Align and attach left leg assembly (H, M and N) to the
previous assembly with four cam locks (AA) and five wood
dowels (CC).
Hardware Used
AA
Cam Lock
CC
Wood Dowel
Glue
DD
14. Using the pilot holes as a guide, fasten the bottom shelf (L) to
the legs (M, N, O and P) by attaching two metal brackets (II) at
each joint, using two 15 mm screws (FF) per metal bracket.
Hardware Used
FF
M3.5 x 15 mm Screw
II
Metal Bracket
15. Place the top panel (A) upside down on a level and protected
surface. Ask for assistance to attach the previous assembly
to the top panel (A) with six cam locks (AA) and six wood
dowels (CC).
Hardware Used
AA
Cam Lock
CC
Wood Dowel
Glue
DD
13
N
H
x 4
M
x 5
L
x 1
B
14
x 16
L
x 8
15
B
H
x 6
I
x 6
A
x 1
AA
10
ASSEMBLY INSTRUCTIONS
16. Insert the assembled drawer into the frame. Extend the ball
bearing slide tracks on the panels (H and I) all the way forward
CC
(including ball bearing cart). Then align the slide runners on
the drawer with the slide tracks and push the drawer carefully
inside until it stops.
AA
K
J
FF
O
II
CC
16
Ball bearing cart
Ball bearing cart
UP
11
DOWN