CARAVITA BBKE Manual De Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Conduit for power supply should be installed by certified
electrician in a concrete footing for the ground anchor of
at least 60x60x60cm. Depending on the soil composition,
larger foundations may be necessary.
When installing the ground anchor, make sure that the
faceplates are perfectly level. If there is any deviation, the
umbrella will not straight.
BBKE Page / Seite / Page / Página 5
SETTInG THE GrounD AncHor
(FooTInG AnD DIMEnSIonS)
InSTALLATIon
Power main service panel (Overcurrent protection)
Recommended 230V/50Hz for lighting
Recommended 400V/50Hz for lighting and heating
Conduit (WP (IP-67) or US equivalent
(not included)
NOTE: Pay careful attention to the orientation of the
umbrella prior to seeing your ground anchor. (See also
Orientation of the umbrella guide - page 6).
Concrete footing must be completely cured prior to
moving on to the next steps.
Electrical installation according to standards.
CAUTION: All electrical installations must be carried out by
certified electrician.

Publicidad

Tabla de contenido
loading

Productos relacionados para CARAVITA BBKE

Tabla de contenido