Descargar Imprimir esta página

Uline H-6890 Instrucciones De Montaje página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 2
Figure 3
3
4
Figure 4
Tension Knob
PAGE 2 OF 12
ASSEMBLY CONTINUED
1
2. Slide footring onto gas lift by pinching rings together at
center of footring and releasing rings to secure. Insert
gas lift and footring assembly into center of base.
Remove protective cap from gas lift. (See Figure 2)
NOTE: For easiest installation, slide footring on
starting from the bottom of the gas lift.
3. Align armrest with holes on bottom of seat cushion.
Use three 1/4 x 1½" screws (3) with three washers (4) to
attach. Repeat on opposite side. (See Figure 3)
NOTE: Use Allen wrench to tighten all screws.
4. Align mechanism with holes on bottom of seat cushion
with tension knob facing front of seat. Use four 5/16 x 7/8"
screws (1) and Allen wrench to attach. (See Figure 4)
0921 IH-6890

Publicidad

loading