Glacier bay 2114SSHD Guía De Uso Y Cuidado página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
5
Inserting the 1/2 in. tube into the straight
tube
□ Place the 1/2 in. tube (A) into the open end of the straight tube
(with spring packed inside) (B).
□ Slide the end cap with hole (CC) over the straight tube (B).
6
Preparing the bottom shelf assembly for
tub ledge installation
noTe: For shower stall preparation see step 8.
□ Place the soft vinyl end cap (DD) on the bottom of
the assembly tube (C).
7
Tub ledge installation
noTe: For shower stall Installation see step 9.
□ Lift the entire assembly into position over the tub ledge.
□ Compress the top of the unit against the ceiling at the
desired location.
□ Move the bottom end into place on the tub ledge so that the
unit is in a vertical position.
□ Place the tape strips (EE) around the seams of the tubes.
CC
B
EE
7
Please contact 1-877-527-0313 for further assistance.
A
B
bottom shelf assembly
DD
the entire assembly
HOMEDEPOT.COM

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

209 032

Tabla de contenido