Handle Installation & Sealing - Jacuzzi ERIKA 60 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

HANDLE INSTALLATION & SEALING
1. Install the door handle (M) using an Allen key.
2. Ensure that the door closes tightly and opens smoothly, and that there is a tight connection between the side
glass panels and the frame as well as the support bar.
Apply a clear silicone water sealant around the outside perimeter of any fixed shower components (horizontally
between bottom of fixed side glass panel and base, as well as vertically between the wall, glass frames, and
any side glass panel).
Allow 24 hours for silicone to dry.
Improper application of silicone sealant may cause your shower to leak.
1
M
2
16

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Erika-gp60

Tabla de contenido