3
Insert Wall Support Beams (WSB) into walls during assembly and
mark the location of the Wall Support Beams on the inteior of the shed
walls with a pen for reference.
Insert a Corner Post (CN1) and a Back and Side Wall Panel
(WP1/WP2) at the rear of the platform.
4
4
.
Continue adding Back and Side Wall
Panels (WP1/WP2) and Corner Post (CN1).
Snap panels together and push down into
the base track. Ensure all parts are fully seated
Insert Wall Support Beams (WSB) into walls as shown and mark the location of the Wall Support Beams on the inteior of the shed
walls with a pen for reference.
WSB
Mark should be visible
2" below top of wall.
18
WSB
WSB
WP2
WP2
WSB
WSB
WP2
WP1
CN1
WSB
WSB
WSB
WP2
WP2
WP1
WSB
WSB
WSB
WP1
WP1
WP1
WSB
WP1