4. Connect unit to an unswitched single AC power
source. (See Figures 3-4)
NOTE: If using 120VAC, connect black and white
leads to building utility.
NOTE: If using 277VAC, connect orange and
white leads to building utility.
NOTE: In some cases, not all leads will be used.
Cap off unused wire.
120VAC
Connect black and white
leads to building utility.
Cap Unused
Orange Wire
Figure 3
PAGE 2 OF 6
INSTALLATION CONTINUED
277VAC
Connect orange and white
leads to building utility.
Cap Unused
Black Wire
Figure 4
1-800-295-5510
5. Put front cover back on unit and tighten screws.
6. Apply AC power to unit. Red pilot light should turn on,
indicating "AC ON." Push the test switch to illuminate
emergency lights. (See Figure 5)
Figure 5
Test Switch
uline.com
Pilot Light
0321 IH-7261