PACKAGE CONTENTS
PART
DESCRIPTION
A
Vanity
B
Vanity Top
HARDWARE CONTENTS
Note: Hardware not shown to size.
AA
Touch-Up Pen
Qty: 1
SAFETY INFORMATION
Please read and understand this entire manual before attempting to assemble, operate or install the
product.
WARNING
• Keep small parts away from children.
• Some steps are more easily handled with 2 adults.
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble
the product.
Estimated Installation Time: 20-30 minutes (24 hours for adhesive to dry).
Tools and materials recommended for installation (not included): saw, hammer, variable speed drill,
tape measure, level, adjustable wrench, stud finder, lag bolts, screwdrivers (Phillips and flathead),
socket and ratchet (for lag bolts), toggle bolts (optional), clear silicone caulk/sealant (do not use
plumber's putty).
QUANTITY
1
1
3