Placing The Cabinet; Supply Line Assembly; Maintenance; Cartridge Replacement - Glacier bay 1001362761 Manual Del Usuario

Gabinete con fregadero y grifo todo en uno
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
7

Placing the Cabinet

Move the assembled unit to its final location. Final hook up of the
supply lines and drain system can now be completed.
NOTE: Supply lines are not included.
The supply lines that attach the faucet to the household water
system, are not supplied with this unit. They need to be purchased
separately.
Follow the manufacturers instructions for proper installation of the
supply lines.

Maintenance

CARTRIDGE REPLACEMENT

□ Before proceeding, turn off the water supply to the faucet.
□ Take off the plastic water indicator by hand, then use the
Allen key to remove the screw and pull out the handle body.
The top lever of the cartridge will be exposed.
□ Unscrew the cap and rings, making sure not to damage the
threads.
□ Pull out the cartridge and replace it with a new 35 mm
(1.4 in.) ceramic cartridge.
□ Replace the rings and the cap.
□ Place the handle body on the cartridge. Lock the screw onto
the handle body and tighten it with the hex wrench. Do not
over tighten.
□ Put the plastic water indicator back into the hole, make sure
the red is on the left and blue is on the right.
All manuals and user guides at all-guides.com
9
Water indicator
Rings
Cartridge
Faucet body
HOMEDEPOT.COM/GLACIERBAY
Please contact 1-855-HD-GLACIER for further assistance.
Screw
Cap
Handle
body

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ql033y

Tabla de contenido