Descargar Imprimir esta página

Cequent Towing Products 50140 Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Item description is located in chart on previous page.
DIESEL
APPLICATION
SHOWN
FIGURE 5
Do not install mounting rails over plastic bed liners. Plastic bed liners must be cut out of the
way to provide metal to metal contact. Mounting rails may be installed on spray in liners.
Use only bolts, nuts, and washers supplied to install this kit. All bolts are Grade 5 and nuts are
Grade 5.
These instructions are guidelines only, actual installation is the responsibility of the installer
and the owner. Always measure truck and trailer before installing hitch to be sure that there is
clearance at the cab and at the bumper to allow for turns.
1.
Lower and remove spare tire if needed to gain more access to the frame.
2.
Detach the wiring harness from the inside of the driver side frame between the fuel tank and the shock absorber mount.
3.
Place the rear mounting rail in the box of the truck. Using your tape measure, center the rail between the weld seams on the
length of the truck box floor and the proper distance from the rear edge of the truck box as illustrated in Figure 6 (diesel) or 6A
(gas).
4.
Mark and center punch the holes at bolt placement as per the illustration in Figure 6. Move the rail out of the way and drill
each position with a 1/8 in. drill bit. WARNING: When drilling holes be aware of potential risks to vehicle components
and make appropriate safe guards to protect them from damage.
5.
Temporarily position the frame brackets
slots of the frame bracket. Remove the frame bracket from the vehicle if the holes align. If not, adjust the 1/8 in. holes so that
they do align.
6.
Drill out the 1/8 in. holes to 11/16 in.
7.
Loosely install the rear frame brackets as follows:
a)
Place the rear brackets
b)
Install a u-bolt
bed support. Loosely install 1/2 in. conical washers
exhaust might need to be temporarily lowered to gain access to the bottom u-bolt end on the passenger side rear
frame bracket, depending on the vehicle.
c)
Feed a 1-3/4 in. carriage bolt
frame using a pull wire. There is a round hole in the inside of the frame that can be used to feed the hardware.
Loosely fasten the carriage bolt
8.
Reposition the mounting rails over the holes. Place the 1-1/4 in. tube
5 in. spacer
(10)
(above or below the bed depending on bed corrugation).
9.
Install the 5/8 in. x 3-1/2 in. long carriage bolts
the hole in the frame bracket under the truck bed. Install 5/8 in. conical washer
z
2010 Cequent Towing Products, Inc.
2
1
For Gas Engines go to step 17.
(2) (4)
on the inside of the frame and check that the 1/8 in. drilled holes align with the
(2) (4)
on the inside of the frame as shown in Figures 4 and 5.
(11)
on each of the brackets. The u-bolt wraps around the outside of the frame, right behind the rear
(15)
and 1 in. x 3 in. block spacer
(15)
with 1/2 in. conical washer
(5)
PCN 15243
4
6
11
(8)
and hex nuts
(12)
(16)
into position in the slot in the bottom of the left
(13)
and hex nut (12).
(9)
spacer between the rail and the bed. Place a 1-1/2 in. x
down through the rail, the tube spacer (9), 1-1/2 in. x 5 in. spacer
Sheet 7 of 30
3
VEHICLE FORWARD
onto the ends of the u-bolts. NOTE: The
(8)
and 5/8 in. nut (14). Snug nuts up by hand.
50140N
05/17/11
(10),
and
Rev. E

Publicidad

loading

Productos relacionados para Cequent Towing Products 50140