Finish floor
1. Shut off main water supple before installation.Then
determine the depth of the embedded hole.Ensure the hole
deep in between 2 12/ 25" to 5 11/14".
2. Put the embedded part into the hole,draw the location
of the mounting holes.Make sure that the level of location
of embedded with spirit level . Then remove the embedded
part ,drilling with Ø 2/5" drill and put the setscrew in
the mounting holes and place the embedded part on the
setscrew,tighten the screws with a adjustable wrench.
3. Connect the hot & cold tube: hot tube be Connected to
the hot water inlet is marked "H" , cold tube be Connected
to the cold water inlet is marked "C". Turn on water supply
to check if there is leakage for every components.
4. Cut the plastic shield so that it extends 3/8" above the
surface of the finished floor.
Finish floor
2-<3/4"-14NPT>
5 3/10"
5. Loosen the lock screws set aside. Then remove the
sealing test plug.
2/5"
6. Get the faucet and shower holder from the box,make sure
the shower holder is placed to the right place,then tighten
the setscrew with an 6mm Allen wrench.
Cold tube
7. Push up the escutcheon. Connecting the faucet with the
Hot tube
embedded part,Then adjust the direction of faucet and
tighten the screws using an 6 mm Allen wrench.
8.Seal the floor around the plastic shield with waterproof
sealant,push down the escutcheon to the floor.
9. Connect the hose and the hand shower ,then rest the
hand shower in the holder.Turn on on-off valve to test the
situation of water.