Descargar Imprimir esta página

Publicidad

Enlaces rápidos

RRC Series Install Sheets
Rotary Recycling Center
Door-Mounted Corner Recycling Center
Rotary Recycling Center
Door-Mounted Corner Recycling Center
(ENG)
(ENG)
(FR/SP)
(FR/SP)

Publicidad

loading

Resumen de contenidos para Knape & Vogt RRC Serie

  • Página 1 RRC Series Install Sheets Rotary Recycling Center (ENG) Door-Mounted Corner Recycling Center (ENG) Rotary Recycling Center (FR/SP) Door-Mounted Corner Recycling Center (FR/SP)
  • Página 2 ROTARY RECYCLING CENTER Installation Instructions Inspect all parts and read all instructions prior to beginning assembly and installation. Parts Included Step 1 Place both of the shaft collars on post. Bottom collar should have A. Basket Hanging Rack slotted side up. Place basket hanging B.
  • Página 3 Door-MouNTeD CorNer reCyCliNg CeNTer Installation Instructions Inspect all parts and read all instructions prior to beginning assembly and installation. Step 1 Hold lower post and locate height adjusting screw in post raising assembly. To check that jack base is properly located for future vertical adjustment, loosen screw 1 turn. Leave the screwdriver in the screw to use as a handle.
  • Página 4: Liste Des Pièces

    Liste des pièces INSTRUCCIONES DE NOTICE DE MONTAGE . Rack de suspension pour conteneurs INSTALACIÓN Porte-conteneurs de recyclage . Axe tournant Centro giratorio de reciclo . Jeu d'embouts supérieurs . Bagues (2) Inspectez toutes les pièces et lisez toutes les Inspeccione todas las piezas y lea todas las .
  • Página 5: Piezas Incluidas

    Meuble D’aNgle - CeNTre De reCyClage MoNTé sur porTe Pièces incluses A. Support des bacs B. Plaque de montage sur porte Notice de montage C. Montant inférieur 1. En tenant le montant inférieur, repérer la vis de réglage de la hauteur sur le dispositif de levage du montant. Afin de vérifier que le socle de levage est correctement positionné pour permettre D.