GYS 025981 Manual De Uso página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 24
Operating manual
CONNECTION OF SEVERAL MODULES
For the SHM device to work, a GYSFLASH CNT charger must be connected to channel 1 (FIG II) via the
SMC cable supplied.
Using the power cord
• If there are as many chargers as there are modules connected to the SHM, the presence of the mains is not mandatory.
Each GYSFLASH provides the necessary energy to the module connected to its channel.
To benefit from the energy supplied by the charger, a module must be connected to the same channel as
a GYSFLASH.
• In general, connecting the SHM to the mains opens up all the channels without having to resort to the number of GYS-
FLASH needed to power all the modules. It should be used when more modules than chargers are to be connected to
the SHM.
Need to use the power cord
1
Number of
2
connected
3
GYSFLASH
4
Example:
A module can be connected to channel 3 (LED on) when:
- a GYSFLASH is connected to channel 3.
- the power cord is plugged in and a GYSFLASH is present on
channel 1.
Connecting a GYSFLASH with several modules:
Connect the GYSFLASH to channel 1 via the SMC lead supplied with the SHM.
1
Connect the modules (SMC cable supplied with the modules).
2
Connect the mains plug.
3
Connect the charger to the battery (refer to the GYSFLASH manual).
4
Switch on the charger.
5
PARALLELING GYSFLASH CNT
Paralleling can only be done with identical GYSFLASH CNT (maximum 4).
Master/Sl ave co mmu nicatio n:
Parallel connection of GYSFLASH CNT chargers is done via a Master/Slave configuration.
 One GYSFLASH (th e Mast er) controls all the others (the Seconda ries).
Setting the GYSFLASH as Mas ter or Slave require s a manipulation on each of them.
12
Translation of the original
instructions
Number of connected modules
1
2
3
No
Yes
Yes
No
No
Yes
No
No
No
No
No
No
4
Yes
Yes
Yes
No
SMART HUB MODULE

Publicidad

Tabla de contenido
loading

Tabla de contenido