ENGLISH
HP &
TE
HPS,
TE
Series
Surge Protective Device (SPD)
Installation, Operation
& Maintenance Manual
WARNING – IMPORTANT – PLEASE READ – WARNING
Safety First – Hazardous Voltage & Shock Hazard
• Only qualified licensed electricians should install or service SPDs
• Hazardous voltages exist within SPDs
• SPDs should never be installed or serviced when energized
• Use appropriate safety precautions including Personal Protection Equipment
• Failure to follow these instructions can result in death, serious injury, and/or equipment damage
• This manual shall be read in its entirety prior to installing
Bonding and Grounding Hazard
Verify that the neutral conductor in the service entrance
equipment is bonded to ground in accordance with the
National Electric Code (NEC
Verify that the neutral terminal (XO) on the secondary side of
distribution transformers are grounded to the system ground in
accordance with the NEC
During installation into an electrical system the SPD must
not be energized until the electrical system is completely
installed, inspected and tested. All conductors must be
connected and functional including the neutral (if required).
The voltage rating of the SPD and system must be verified
before energizing the SPD.
Failure to follow these guidelines can lead to abnormally high
voltages at the SPD. This may cause the SPD to fail. The
warranty is voided if the SPD is incorrectly installed and/or if
Advanced Protection Technologies
14550 58th Street North
(800) 237-4567
www.aptsurge.com
UL is a registered trademark of Underwriters Laboratories, NEC
registered trademarks of National Fire Protection Association, C62.41.1-2002, C62.41.2-2002,
C62.45-2002, C62.72-2007 are registered trademarks of IEEE.
All manuals and user guides at all-guides.com
®
) and all applicable codes.
®
and all applicable codes.
·
Clearwater, Florida 33760
·
·
(727) 535-6339
·
info@apttvss.com
®
and National Electrical Code are
TE/HPS
TE/HP
the neutral conductor in the service entrance equipment or
downstream of separately derived systems is not bonded to
ground in accordance with the NEC
Do Not Hi-Pot Test SPDs
Any factory or on-site testing of power distribution
equipment that exceeds normal operating voltage such as
high-potential insulation testing, or any other tests where the
suppression components will be subjected to higher voltage
than their rated Maximum Continuous Operating Voltage
(MCOV) must be conducted with the SPD disconnected
from the power source. For 4-wire systems, the neutral
connection at the SPD must also be disconnected prior to
performing high-potential testing and then reconnected after
test completion.
Failure to disconnect SPD and associated components
during elevated voltage testing will damage the SPD and
will void the warranty.
Fax (727) 539-8955
XTE/HP &
XTE/HPS
V
®
.
European Authorized Representative
Obelis s.a.
Boulevard Général Wahis 53
1030 Brussels, BELGIUM
Tel: +(32) 2. 732.59.54
Fax: +(32) 2. 732.60.03
E-Mail: mail@obelis.net
12.30.14.lh #8380