Molift Partner 255 / www.etac.com
Charge the battery. The battery must not be in
the battery holder during assembly!
Lifting column
Place lifting column in chassis.
Make sure that the red arrow on the lower part of
the column corresponds with the edge of chassis.
Make sure screw on column is inside the hole
on chassis. This will prevent the column from
unintentionally being lifted out of chassis when
lock handle is pushed down.
Fix the column by pushing the lock handle on the
back all the way down.
Battery and Hand control
1. Connect hand control to bottom of battery
holder.
2. Insert battery with terminals facing down.
3. Connect hand control wire to push handle
bracket so it does not fall to the floor when
dropped.
Assembly
Mounting Sling bar
1. Press the sling bar bolt up and through the
lifting arm.
2. Make sure the bolt is correctly alligned befeore
pressing the plastic cup back on the arm.
3. Make sure sling bar is properly fastened
Checklist after assembly
Do not start using lifter before
completing control according to
checklist after assembly.
Use this checklist to verify that the lifter is properly
installed and can operate correctly and safely
before use.
Ensure that the lifting arm, lifting column and
sling bar are properly fixed and that there are
no loose parts on the lifter.
Make sure battery is charged (no lights on the
battery lamps).
Check that the lifter has no apparent damage
or other faults.
Perform one lift with load (60-80 kg)
8