Apply 5/8" of cement finishing to top, sides and back of waterfall to encase unit. Slope top
surface slightly towards back, 1/4 bubble on level. Remove excess cement from front of falls.
4
Finishing the Waterfall
Use thin-set to install coping material onto cement on top of waterfall. Tap in and level.
Remove bender board.
Completed Installation - Front
After system inspection, use appropriate fitting(s) to connect the waterfall inlet(s) to the
plumbing lines. Do not apply torque to the inlet fittings.
• For 12"- 60" units use 1-1/2" coupling or 90-degree elbow.
• For 72"- 96" units use 2" coupling or 90-degree elbow.
All manuals and user guides at all-guides.com
www.polarispool.com
Completed Installation - Back