Guidelines When Installing The Drain Piping - Daikin FDXM25F3V1B Manual De Instalación

Ocultar thumbs Ver también para FDXM25F3V1B:
Tabla de contenido

Publicidad

The ducting is to be field supplied.
▪ Air inlet side. Attach the duct and intake-side flange (field
supply). For connecting the flange, use 7 accessory screws.
a b
c
b
d
e
a
Connection screw (accessory)
b
Flange (field supply)
c
Main unit
d
Insulation (field supply)
e
Aluminium tape (field supply)
▪ Filter. Be sure to attach an air filter inside the air passage on the
intake side. Use an air filter with dust collecting efficiency ≥50%
(gravimetric method). The included filter is not used when the
intake duct is attached.
▪ Air outlet side. Connect the duct according to the inside
dimension of the outlet-side flange.
▪ Air leaks. Wind aluminium tape around the intake side flange and
duct connection. Make sure there are no air leaks at any other
connection.
▪ Insulation. Insulate the duct to prevent condensation from
forming. Use glass wool or polyethylene foam 25 mm thick.
5.1.3
Guidelines when installing the drain
piping
General guidelines
▪ Drain pump. For this "high lift type", the drainage sounds will be
reduced when the drain pump is installed in a higher location.
Recommended height is 300 mm.
▪ Pipe length. Keep drain piping as short as possible.
▪ Pipe size. Keep the pipe size equal to or greater than that of the
connecting pipe (vinyl pipe of 20  mm nominal diameter and
26 mm outer diameter).
▪ Slope. Make sure the drain piping slopes down (at least 1/100) to
prevent air from being trapped in the piping. Use hanging bars as
shown.
1~1.5 m
a
a
Hanging bar
O
Allowed
X
Not allowed
▪ Condensation. Take measures against condensation. Insulate
the complete drain piping in the building.
To connect the drain piping to the indoor unit
NOTICE
Incorrect connection of the drain hose might cause leaks,
and damage the installation space and surroundings.
1 Push the drain hose as far as possible over the drain pipe
connection.
2 Tighten the metal clamp until the screw head is less than 4 mm
from the metal clamp part.
3 Check for water leaks (see
page 7).
4 Install the insulation piece (drain pipe).
FDXM25~60F3V1B(9)
Split system air conditioners
4P472267-1B – 2018.07
All manuals and user guides at all-guides.com
a
e
d
"To check for water leaks"  on
5 Wind the large sealing pad (= insulation) around the metal
clamp and drain hose, and fix it with cable ties.
6 Connect the drain piping to the drain hose.
1
2~6
a
b
e
4
1
A-A'
a
Drain pipe connection (attached to the unit)
b
Drain hose (accessory)
c
Metal clamp (accessory)
d
Large sealing pad (accessory)
e
Insulation piece (drain pipe) (accessory)
f
Drain piping (field supply)
NOTICE
▪ Do NOT remove the drain pipe plug. Water might leak
out.
▪ Use the drain outlet only to discharge the water if the
drain pump is not used or before maintenance.
▪ Insert and remove the drain plug gently. Excessive
force may deform the drain socket of the drain pan.
Pull out the plug.
▪ Do NOT wiggle the plug up and down.
a
Push in the plug.
▪ Set the plug and push it in using a Phillips screwdriver.
a
b
a
Drain plug
b
Phillips screwdriver
To check for water leaks
Gradually pour approximately 1  l of water in the drain pan, and
check for water leaks.
a
b
d
e
c
a
Air outlet
b
Portable pump
5 Installation
c
d
f
2
5
6
A
A
A'
A'
≤4 mm
d
c
3
b
a
Installation manual
7

Publicidad

Tabla de contenido
loading

Tabla de contenido